Facts

Description

The access to the building site was limited. The neighbours shouldn´t be disturbed too much and the client got his fourth child. The precisely drawn BIM (Building Information Model) allowed a very high degree of prefabrication - including the complete fascade.

Publication

Architekt Walter Klasz – 4550 Kremsmünster (seit September 2019) | walter@klasz.at | +43 699 16766654Imprint

powered by webEdition CMS